1 |
Fir/c 8 Logs 184 cfts Round 2nd Normal |
0.0000 |
184.0000 Cft |
INR |
|
2 |
Fir/c 1 Logs 80 cfts Round 2nd Normal |
0.0000 |
80.0000 Cft |
INR |
|
3 |
Fir/c 3 Logs 353 cfts Round 2nd Normal |
0.0000 |
353.0000 Cft |
INR |
|
4 |
Fir/c 6 Logs 334 cfts Round 2nd Normal |
0.0000 |
334.0000 Cft |
INR |
|
5 |
Fir/c 3 Logs 206 cfts Round 2nd Normal |
0.0000 |
206.0000 Cft |
INR |
|
6 |
Fir/c 12 Logs 359 cfts Round 2nd Normal |
0.0000 |
359.0000 Cft |
INR |
|
7 |
Fir/c 17 Logs 440 cfts Round 2nd Normal |
0.0000 |
440.0000 Cft |
INR |
|
8 |
Fir/c 3 Logs 97 cfts Round 2nd Normal |
0.0000 |
97.0000 Cft |
INR |
|
9 |
Fir/c 16 Logs 339 cfts Round 2nd Normal |
0.0000 |
339.0000 Cft |
INR |
|
10 |
Fir/c 14 Logs 373 cfts Round 2nd Normal |
0.0000 |
373.0000 Cft |
INR |
|
11 |
Fir/c 9 Logs 197 cfts Round 2nd Normal |
0.0000 |
197.0000 Cft |
INR |
|
12 |
Fir/c 11 Logs 243 cfts Round 2nd Normal |
0.0000 |
243.0000 Cft |
INR |
|
13 |
Fir/c 11 Logs 370 cfts Round 2nd Normal |
0.0000 |
370.0000 Cft |
INR |
|
14 |
Fir/c 16 Logs 368 cfts Round 2nd Normal |
0.0000 |
368.0000 Cft |
INR |
|
15 |
Fir/c 17 Logs 433 cfts Round 2nd Normal |
0.0000 |
433.0000 Cft |
INR |
|
16 |
Fir/c 13 Logs 326 cfts Round 2nd Normal |
0.0000 |
326.0000 Cft |
INR |
|
17 |
Fir/c 14 Logs 359 cfts Round 2nd Normal |
0.0000 |
359.0000 Cft |
INR |
|
18 |
Fir/c 5 Logs 138 cfts Round 2nd Normal |
0.0000 |
138.0000 Cft |
INR |
|
19 |
Fir/c 4 Logs 83 cfts Round 2nd Normal |
0.0000 |
83.0000 Cft |
INR |
|
20 |
Kail/c 3 Logs 34 cfts Round FCA 2nd Normal |
0.0000 |
34.0000 Cft |
INR |
|
21 |
Kail/c 14 Logs 129 cfts Round FCA 2nd Normal |
0.0000 |
129.0000 Cft |
INR |
|
22 |
Deo/c 60-up 2 Logs 47 cfts Round FCA 2nd Normal |
0.0000 |
47.0000 Cft |
INR |
|
23 |
Deo/c 60 Below 3 Logs 52 cfts Round FCA 2nd Normal |
0.0000 |
52.0000 Cft |
INR |
|
24 |
Deo/c 60-up 1 Logs 21 cfts Round FCA 2nd Normal |
0.0000 |
21.0000 Cft |
INR |
|
25 |
Deo/c 60-up 1 Logs 32 cfts Round FCA 2nd Normal |
0.0000 |
32.0000 Cft |
INR |
|
26 |
Deo/c 60-up 1 Logs 15 cfts Round FCA 2nd Normal |
0.0000 |
15.0000 Cft |
INR |
|
27 |
Deo/c 60-up 1 Logs 30 cfts Round FCA 2nd Normal |
0.0000 |
30.0000 Cft |
INR |
|
28 |
Deo/c 60 Below 2 Logs 20 cfts Round FCA 2nd Normal |
0.0000 |
20.0000 Cft |
INR |
|
29 |
Kail/c 2 Logs 40 cfts Round FCA 2nd Normal |
0.0000 |
40.0000 Cft |
INR |
|
30 |
Deo/c 60-up 1 Logs 56 cfts Round FCA 2nd Normal |
0.0000 |
56.0000 Cft |
INR |
|
31 |
Kail/c 5 Logs 122 cfts Round FCA 2nd Normal |
0.0000 |
122.0000 Cft |
INR |
|
32 |
Deo/c 60-up 4 Logs 116 cfts Round FCA 2nd Normal |
0.0000 |
116.0000 Cft |
INR |
|
33 |
Deo/c 60-up 3 Logs 129 cfts Round FCA 2nd Normal |
0.0000 |
129.0000 Cft |
INR |
|
34 |
Kail/c 3 Logs 81 cfts Round FCA 2nd Normal |
0.0000 |
81.0000 Cft |
INR |
|
35 |
Deo/c 60-up 2 Logs 75 cfts Round FCA 2nd Normal |
0.0000 |
75.0000 Cft |
INR |
|
36 |
Deo/c 60-up 5 Logs 165 cfts Round FCA 2nd Normal |
0.0000 |
165.0000 Cft |
INR |
|
37 |
Kail/c 29 Logs 127 cfts Round 2nd Normal |
0.0000 |
127.0000 Cft |
INR |
|
38 |
Deo/c 60 Below 13 Logs 55 cfts Round 2nd Normal |
0.0000 |
55.0000 Cft |
INR |
|
39 |
Deo/c 60 Below 32 Logs 141 cfts Round 2nd Normal |
0.0000 |
141.0000 Cft |
INR |
|
40 |
Deo/c 60-up 3 Logs 64 cfts Round 2nd Normal |
0.0000 |
64.0000 Cft |
INR |
|
41 |
Deo/c 60 Below 8 Logs 15 cfts Round |
0.0000 |
15.0000 Cft |
INR |
|
42 |
Deo/c 60-up 1 Logs 12 cfts Round 2nd Normal |
0.0000 |
12.0000 Cft |
INR |
|
43 |
Deo/c 60-up 5 Logs 106 cfts Round CTSD |
0.0000 |
106.0000 Cft |
INR |
|
44 |
Fir/c 19 Logs 100 cfts Round CTSD 2nd Normal |
0.0000 |
100.0000 Cft |
INR |
|
45 |
Deo/c 60 Below 32 Logs 176 cfts Round CTSD 2nd Normal |
0.0000 |
176.0000 Cft |
INR |
|
46 |
Deo/c 60-up 3 Logs 59 cfts Round CTSD |
0.0000 |
59.0000 Cft |
INR |
|
47 |
Deo/c 60 Below 20 Logs 113 cfts Round CTSD 2nd Normal |
0.0000 |
113.0000 Cft |
INR |
|
48 |
Kail/c 4 Logs 64 cfts Round CTSD |
0.0000 |
64.0000 Cft |
INR |
|
49 |
Fir/c 6 Logs 125 cfts Round CTSD |
0.0000 |
125.0000 Cft |
INR |
|
50 |
Fir/c 1 Logs 41 cfts Round CTSD |
0.0000 |
41.0000 Cft |
INR |
|
51 |
Deo/c 60 Below 31 Logs 81 cfts Round CTSD 2nd Normal |
0.0000 |
81.0000 Cft |
INR |
|
52 |
Deo/c 60 Below 30 Logs 95 cfts Round CTSD 2nd Normal |
0.0000 |
95.0000 Cft |
INR |
|
53 |
Deo/c 60 Below 3 Logs 49 cfts Round CTSD 2nd Normal |
0.0000 |
49.0000 Cft |
INR |
|
54 |
Kail/c 8 Logs 158 cfts Round CTSD 2nd Normal |
0.0000 |
158.0000 Cft |
INR |
|
55 |
Fir/c 1 Logs 8 cfts Round CTSD 2nd Normal |
0.0000 |
8.0000 Cft |
INR |
|
56 |
Deo/c 60 Below 7 Logs 69 cfts Round CTSD 2nd Normal |
0.0000 |
69.0000 Cft |
INR |
|
57 |
Kail/c 16 Logs 233 cfts Round CTSD 2nd Normal |
0.0000 |
233.0000 Cft |
INR |
|
58 |
Fir/c 14 Logs 178 cfts Round CTSD 2nd Normal |
0.0000 |
178.0000 Cft |
INR |
|
59 |
Fir/c Karries No's 3=5.33 cfts 2nd Normal Sawn |
0.0000 |
5.3300 Cft |
INR |
|
60 |
Kail/c Karries No's 11=15.73 cfts 2nd Normal Sawn |
0.0000 |
15.7300 Cft |
INR |
|
61 |
Kail/c Karries No's 7=4.43 cfts 2nd Normal Sawn |
0.0000 |
4.4300 Cft |
INR |
|
62 |
Deo/c Balla planks under No's 1=1.78 cfts 2nd Normal Sawn |
0.0000 |
1.7800 Cft |
INR |
|
63 |
Deo/c Balla planks under No's 4=10.46 cfts 2nd Normal Sawn |
0.0000 |
10.4600 Cft |
INR |
|
64 |
Fir/c 14 logs 323 cfts Reduction |
0.0000 |
323.0000 Cft |
INR |
|
65 |
Fir/c 14 logs 245 cfts Reduction |
0.0000 |
245.0000 Cft |
INR |
|
66 |
kail/c 6 logs 138 cfts Reduction |
0.0000 |
138.0000 Cft |
INR |
|
67 |
Fir/c 13 logs 201 cfts Reduction |
0.0000 |
201.0000 Cft |
INR |
|
68 |
Fir/c 13 logs 219 cfts Reduction |
0.0000 |
219.0000 Cft |
INR |
|
69 |
Fir/c 7 logs 203 cfts Reduction |
0.0000 |
203.0000 Cft |
INR |
|
70 |
Fir/c 11 logs 240 cfts Reduction |
0.0000 |
240.0000 Cft |
INR |
|
71 |
Fir/c 16 logs 282 cfts Reduction |
0.0000 |
282.0000 Cft |
INR |
|
72 |
kail/c 6 logs 70 cfts Reduction |
0.0000 |
70.0000 Cft |
INR |
|
73 |
Fir/c 9 logs 222 cfts Reduction |
0.0000 |
222.0000 Cft |
INR |
|
74 |
Fir/c 11 logs 153 cfts Reduction |
0.0000 |
153.0000 Cft |
INR |
|
75 |
kail/c 13 logs 276 cfts Reduction |
0.0000 |
276.0000 Cft |
INR |
|
76 |
kail/c 11 logs 298 cfts Reduction |
0.0000 |
298.0000 Cft |
INR |
|
77 |
Fir/c 15 logs 344 cfts Reduction |
0.0000 |
344.0000 Cft |
INR |
|
78 |
kail/c 16 logs 373 cfts Reduction |
0.0000 |
373.0000 Cft |
INR |
|
79 |
Fir/c 6 logs 220 cfts Reduction |
0.0000 |
220.0000 Cft |
INR |
|
80 |
Deo/c 60 UP 2 logs 93 cfts Reduction |
0.0000 |
93.0000 Cft |
INR |
|
81 |
kail/c 13 logs 265 cfts Reduction |
0.0000 |
265.0000 Cft |
INR |
|
82 |
kail/c 8 logs 202 cfts Reduction |
0.0000 |
202.0000 Cft |
INR |
|
83 |
Fir/c 13 logs 299 cfts Reduction |
0.0000 |
299.0000 Cft |
INR |
|
84 |
Fir/c 12 logs 396 cfts Reduction |
0.0000 |
396.0000 Cft |
INR |
|
85 |
Fir/c 9 logs 100 cfts Reduction |
0.0000 |
100.0000 Cft |
INR |
|
86 |
Fir/c 9 logs 138 cfts Reduction |
0.0000 |
138.0000 Cft |
INR |
|
87 |
Fir/c 13 logs 252 cfts Reduction |
0.0000 |
252.0000 Cft |
INR |
|
88 |
kail/c 13 logs 238 cfts Reduction |
0.0000 |
238.0000 Cft |
INR |
|
89 |
kail/c 14 logs 298 cfts Reduction |
0.0000 |
298.0000 Cft |
INR |
|
90 |
Fir/c 13 logs 353 cfts Reduction |
0.0000 |
353.0000 Cft |
INR |
|
91 |
kail/c 9 logs 249 cfts Reduction |
0.0000 |
249.0000 Cft |
INR |
|
92 |
kail/c 5 logs 120 cfts Reduction |
0.0000 |
120.0000 Cft |
INR |
|
93 |
Fir/c 14 logs 470 cfts Reduction |
0.0000 |
470.0000 Cft |
INR |
|
94 |
Fir/c 11 logs 192 cfts Reduction |
0.0000 |
192.0000 Cft |
INR |
|
95 |
Fir/c 8 logs 227 cfts Reduction |
0.0000 |
227.0000 Cft |
INR |
|
96 |
Fir/c 12 logs 384 cfts Reduction |
0.0000 |
384.0000 Cft |
INR |
|
97 |
Fir/c 8 logs 221 cfts Reduction |
0.0000 |
221.0000 Cft |
INR |
|
98 |
kail/c 9 logs 165 cfts Reduction |
0.0000 |
165.0000 Cft |
INR |
|
99 |
Fir/c 19 logs 358 cfts Reduction |
0.0000 |
358.0000 Cft |
INR |
|
100 |
Fir/c 26 logs 645 cfts Reduction |
0.0000 |
645.0000 Cft |
INR |
|
101 |
Fir/c 13 logs 288 cfts Reduction |
0.0000 |
288.0000 Cft |
INR |
|
102 |
Fir/c 9 logs 301 cfts Reduction |
0.0000 |
301.0000 Cft |
INR |
|
103 |
Fir/c 15 logs 402 cfts Reduction |
0.0000 |
402.0000 Cft |
INR |
|
104 |
kail/c 11 logs 167 cfts Reduction |
0.0000 |
167.0000 Cft |
INR |
|
105 |
Fir/c 15 logs 306 cfts Reduction |
0.0000 |
306.0000 Cft |
INR |
|
106 |
kail/c 13 logs 276 cfts Reduction |
0.0000 |
276.0000 Cft |
INR |
|
107 |
Fir/c 16 logs 402 cfts Reduction |
0.0000 |
402.0000 Cft |
INR |
|
108 |
Fir/c 23 logs 457 cfts Reduction |
0.0000 |
457.0000 Cft |
INR |
|
109 |
Fir/c 14 logs 497 cfts Reduction |
0.0000 |
497.0000 Cft |
INR |
|
110 |
kail/c 6 logs 115 cfts Reduction |
0.0000 |
115.0000 Cft |
INR |
|
111 |
Deo/c 60 UP 1 logs 44 cfts Reduction |
0.0000 |
44.0000 Cft |
INR |
|
112 |
Fir/c 1 logs 50 cfts Reduction |
0.0000 |
50.0000 Cft |
INR |
|
113 |
Fir/c 2 logs 65 cfts Reduction |
0.0000 |
65.0000 Cft |
INR |
|
114 |
Deo/c 60 UP 1 logs 27 cfts Reduction |
0.0000 |
27.0000 Cft |
INR |
|
115 |
Fir/c 11 logs 277 cfts Reduction |
0.0000 |
277.0000 Cft |
INR |
|
116 |
Fir/c 16 logs 380 cfts Reduction |
0.0000 |
380.0000 Cft |
INR |
|
117 |
Fir/c 8 logs 117 cfts Reduction |
0.0000 |
117.0000 Cft |
INR |
|
118 |
kail/c 11 logs 247 cfts Reduction |
0.0000 |
247.0000 Cft |
INR |
|
119 |
kail/c 6 logs 140 cfts Reduction |
0.0000 |
140.0000 Cft |
INR |
|
120 |
Fir/c 14 logs 250 cfts Reduction |
0.0000 |
250.0000 Cft |
INR |
|
121 |
kail/c 8 logs 158 cfts Reduction |
0.0000 |
158.0000 Cft |
INR |
|
122 |
Deo/c 60 UP 2 logs 39 cfts Reduction |
0.0000 |
39.0000 Cft |
INR |
|
123 |
Fir/c 10 logs 165 cfts Reduction |
0.0000 |
165.0000 Cft |
INR |
|
124 |
Fir/c 11 logs 322 cfts Reduction |
0.0000 |
322.0000 Cft |
INR |
|
125 |
kail/c 5 logs 154 cfts Reduction |
0.0000 |
154.0000 Cft |
INR |
|
126 |
Fir/c 15 logs 413 cfts Reduction |
0.0000 |
413.0000 Cft |
INR |
|
127 |
Fir/c 24 logs 423 cfts Reduction |
0.0000 |
423.0000 Cft |
INR |
|
128 |
Fir/c 10 logs 248 cfts Reduction |
0.0000 |
248.0000 Cft |
INR |
|
129 |
Fir/c 19 logs 392 cfts Reduction |
0.0000 |
392.0000 Cft |
INR |
|
130 |
Fir/c 19 logs 471 cfts Reduction |
0.0000 |
471.0000 Cft |
INR |
|
131 |
Fir/c 5 logs 223 cfts Reduction |
0.0000 |
223.0000 Cft |
INR |
|
132 |
Fir/c 13 logs 446 cfts Reduction |
0.0000 |
446.0000 Cft |
INR |
|
133 |
Fir/c 13 logs 357 cfts Reduction |
0.0000 |
357.0000 Cft |
INR |
|
134 |
Fir/c 15 logs 349 cfts Reduction |
0.0000 |
349.0000 Cft |
INR |
|
135 |
Deo/c 60 UP 4 logs 86 cfts Reduction |
0.0000 |
86.0000 Cft |
INR |
|
136 |
Deo/c 60 UP 4 logs 85 cfts Reduction |
0.0000 |
85.0000 Cft |
INR |
|
137 |
Deo/c 60 UP 2 logs 168 cfts Reduction |
0.0000 |
168.0000 Cft |
INR |
|
138 |
Deo/c 60 UP 4 logs 176 cfts Reduction |
0.0000 |
176.0000 Cft |
INR |
|
139 |
Deo/c 60 UP 5 logs 281 cfts Reduction |
0.0000 |
281.0000 Cft |
INR |
|
140 |
Deo/c 60 UP 7 logs 179 cfts Reduction |
0.0000 |
179.0000 Cft |
INR |
|
141 |
Fir/c 7 logs 316 cfts Reduction |
0.0000 |
316.0000 Cft |
INR |
|
142 |
Fir/c 12 logs 293 cfts Reduction |
0.0000 |
293.0000 Cft |
INR |
|
143 |
Deo/c 60 UP 6 logs 138 cfts Reduction |
0.0000 |
138.0000 Cft |
INR |
|
144 |
Fir/c 13 logs 353 cfts Reduction |
0.0000 |
353.0000 Cft |
INR |
|
145 |
Deo/c 60 UP 5 logs 178 cfts Reduction |
0.0000 |
178.0000 Cft |
INR |
|
146 |
Fir/c 13 logs 320 cfts Reduction |
0.0000 |
320.0000 Cft |
INR |
|
147 |
Fir/c 16 logs 433 cfts Reduction |
0.0000 |
433.0000 Cft |
INR |
|
148 |
Fir/c 6 logs 200 cfts Reduction |
0.0000 |
200.0000 Cft |
INR |
|
149 |
Fir/c 12 logs 311 cfts Reduction |
0.0000 |
311.0000 Cft |
INR |
|
150 |
kail/c 3 logs 132 cfts Reduction |
0.0000 |
132.0000 Cft |
INR |
|
151 |
Fir/c 13 logs 329 cfts Reduction |
0.0000 |
329.0000 Cft |
INR |
|
152 |
Fir/c 12 logs 324 cfts Reduction |
0.0000 |
324.0000 Cft |
INR |
|
153 |
Fir/c 8 logs 266 cfts Reduction |
0.0000 |
266.0000 Cft |
INR |
|
154 |
kail/c 1 logs 63 cfts Reduction |
0.0000 |
63.0000 Cft |
INR |
|
155 |
Fir/c 16 logs 538 cfts Reduction |
0.0000 |
538.0000 Cft |
INR |
|
156 |
Fir/c 14 logs 504 cfts Reduction |
0.0000 |
504.0000 Cft |
INR |
|
157 |
Fir/c 8 logs 275 cfts Reduction |
0.0000 |
275.0000 Cft |
INR |
|
158 |
Deo/c 60 UP 2 logs 49 cfts Reduction |
0.0000 |
49.0000 Cft |
INR |
|
159 |
kail/c 6 logs 74 cfts Reduction |
0.0000 |
74.0000 Cft |
INR |
|
160 |
Fir/c 14 logs 360 cfts Reduction |
0.0000 |
360.0000 Cft |
INR |
|
161 |
Fir/c 7 logs 248 cfts Reduction |
0.0000 |
248.0000 Cft |
INR |
|
162 |
Deo/c 60 UP 1 logs 26 cfts Reduction |
0.0000 |
26.0000 Cft |
INR |
|
163 |
Fir/c 9 logs 365 cfts Reduction |
0.0000 |
365.0000 Cft |
INR |
|
164 |
Deo/c 60 Below 16 logs 175 cfts Reduction |
0.0000 |
175.0000 Cft |
INR |
|
165 |
kail/c 5 logs 154 cfts Reduction |
0.0000 |
154.0000 Cft |
INR |
|
166 |
Fir/c 9 logs 286 cfts Reduction |
0.0000 |
286.0000 Cft |
INR |
|
167 |
Deo/c 60 UP 2 logs 58 cfts Reduction |
0.0000 |
58.0000 Cft |
INR |
|
168 |
Deo/c 60 UP 1 logs 23 cfts Reduction |
0.0000 |
23.0000 Cft |
INR |
|
169 |
kail/c 8 logs 142 cfts Reduction |
0.0000 |
142.0000 Cft |
INR |
|
170 |
Fir/c 10 logs 194 cfts Reduction |
0.0000 |
194.0000 Cft |
INR |
|
171 |
Fir/c 5 logs 280 cfts Reduction |
0.0000 |
280.0000 Cft |
INR |
|
172 |
kail/c 6 logs 131 cfts Reduction |
0.0000 |
131.0000 Cft |
INR |
|
173 |
Fir/c 10 logs 327 cfts Reduction |
0.0000 |
327.0000 Cft |
INR |
|
174 |
Fir/c 6 logs 104 cfts Reduction |
0.0000 |
104.0000 Cft |
INR |
|
175 |
Fir/c 10 logs 369 cfts Reduction |
0.0000 |
369.0000 Cft |
INR |
|
176 |
kail/c 8 logs 161 cfts Reduction |
0.0000 |
161.0000 Cft |
INR |
|
177 |
kail/c 3 logs 46 cfts Reduction |
0.0000 |
46.0000 Cft |
INR |
|
178 |
Fir/c 5 logs 199 cfts Reduction |
0.0000 |
199.0000 Cft |
INR |
|
179 |
Fir/c 4 logs 158 cfts Reduction |
0.0000 |
158.0000 Cft |
INR |
|
180 |
kail/c 13 logs 187 cfts Reduction |
0.0000 |
187.0000 Cft |
INR |
|
181 |
kail/c 16 logs 240 cfts Reduction |
0.0000 |
240.0000 Cft |
INR |
|
182 |
Fir/c 6 logs 392 cfts Reduction |
0.0000 |
392.0000 Cft |
INR |
|
183 |
Fir/c 15 logs 292 cfts Reduction |
0.0000 |
292.0000 Cft |
INR |
|
184 |
Fir/c 8 logs 191 cfts Reduction |
0.0000 |
191.0000 Cft |
INR |
|
185 |
kail/c 8 logs 107 cfts Reduction |
0.0000 |
107.0000 Cft |
INR |
|
186 |
Fir/c 13 logs 369 cfts Reduction |
0.0000 |
369.0000 Cft |
INR |
|
187 |
kail/c 10 logs 130 cfts Reduction |
0.0000 |
130.0000 Cft |
INR |
|
188 |
Fir/c 7 logs 238 cfts Reduction |
0.0000 |
238.0000 Cft |
INR |
|
189 |
Deo/c 60 UP 1 logs 41 cfts Reduction |
0.0000 |
41.0000 Cft |
INR |
|
190 |
Fir/c 7 logs 311 cfts Reduction |
0.0000 |
311.0000 Cft |
INR |
|
191 |
Deo/c 60 Below 10 logs 86 cfts Reduction |
0.0000 |
86.0000 Cft |
INR |
|
192 |
Fir/c 5 logs 209 cfts Reduction |
0.0000 |
209.0000 Cft |
INR |
|
193 |
Fir/c 6 logs 290 cfts Reduction |
0.0000 |
290.0000 Cft |
INR |
|
194 |
Fir/c 17 logs 285 cfts Reduction |
0.0000 |
285.0000 Cft |
INR |
|
195 |
Fir/c 12 logs 315 cfts Reduction |
0.0000 |
315.0000 Cft |
INR |
|
196 |
kail/c 5 logs 95 cfts Reduction |
0.0000 |
95.0000 Cft |
INR |
|
197 |
Deo/c 60 UP 1 logs 45 cfts Reduction |
0.0000 |
45.0000 Cft |
INR |
|
198 |
Fir/c 15 logs 300 cfts Reduction |
0.0000 |
300.0000 Cft |
INR |
|
199 |
Deo/c 60 UP 3 logs 82 cfts Reduction |
0.0000 |
82.0000 Cft |
INR |
|
200 |
Fir/c 6 logs 229 cfts Reduction |
0.0000 |
229.0000 Cft |
INR |
|
201 |
Fir/c 14 logs 375 cfts Reduction |
0.0000 |
375.0000 Cft |
INR |
|
202 |
Deo/c 60 UP 5 logs 154 cfts Reduction |
0.0000 |
154.0000 Cft |
INR |
|
203 |
kail/c 13 logs 182 cfts Reduction |
0.0000 |
182.0000 Cft |
INR |
|
204 |
kail/c 21 logs 375 cfts Reduction |
0.0000 |
375.0000 Cft |
INR |
|
205 |
kail/c 21 logs 341 cfts Reduction |
0.0000 |
341.0000 Cft |
INR |
|
206 |
kail/c 15 logs 322 cfts Reduction |
0.0000 |
322.0000 Cft |
INR |
|
207 |
Fir/c 4 logs 160 cfts Reduction |
0.0000 |
160.0000 Cft |
INR |
|
208 |
kail/c 14 logs 230 cfts Reduction |
0.0000 |
230.0000 Cft |
INR |
|
209 |
Deo/c 60 Below 7 logs 100 cfts Reduction |
0.0000 |
100.0000 Cft |
INR |
|
210 |
kail/c 8 logs 189 cfts Reduction |
0.0000 |
189.0000 Cft |
INR |
|
211 |
Fir/c 14 Logs 321 cfts Round |
0.0000 |
321.0000 Cft |
INR |
|