1 |
Deo/c 60-up 2 logs 50 cfts Round 2nd Normal |
0.0000 |
50.0000 Cft |
INR |
|
2 |
Fir/c 10 logs 333 cfts Round 2nd Normal |
0.0000 |
333.0000 Cft |
INR |
|
3 |
Fir/c 14 logs 407 cfts Round 2nd Normal |
0.0000 |
407.0000 Cft |
INR |
|
4 |
Fir/c 13 logs 295 cfts Round 2nd Normal |
0.0000 |
295.0000 Cft |
INR |
|
5 |
Fir/c 6 logs 250 cfts Round 2nd Normal |
0.0000 |
250.0000 Cft |
INR |
|
6 |
Fir/c 14 logs 229 cfts Round 2nd Normal |
0.0000 |
229.0000 Cft |
INR |
|
7 |
Fir/c 11 logs 311 cfts Round 2nd Normal |
0.0000 |
311.0000 Cft |
INR |
|
8 |
Fir/c 11 logs 384 cfts Round 2nd Normal |
0.0000 |
384.0000 Cft |
INR |
|
9 |
Fir/c 8 logs 276 cfts Round 2nd Normal |
0.0000 |
276.0000 Cft |
INR |
|
10 |
Fir/c 14 logs 317 cfts Round 2nd Normal |
0.0000 |
317.0000 Cft |
INR |
|
11 |
Fir/c 13 logs 438 cfts Round 2nd Normal |
0.0000 |
438.0000 Cft |
INR |
|
12 |
Fir/c 18 logs 316 cfts Round 2nd Normal |
0.0000 |
316.0000 Cft |
INR |
|
13 |
Fir/c 6 logs 295 cfts Round 2nd Normal |
0.0000 |
295.0000 Cft |
INR |
|
14 |
Fir/c 10 logs 349 cfts Round 2nd Normal |
0.0000 |
349.0000 Cft |
INR |
|
15 |
Fir/c 18 logs 461 cfts Round 2nd Normal |
0.0000 |
461.0000 Cft |
INR |
|
16 |
Fir/c 21 logs 470 cfts Round 2nd Normal |
0.0000 |
470.0000 Cft |
INR |
|
17 |
Deo/c 60-up 3 logs 110 cfts Round 2nd Normal |
0.0000 |
110.0000 Cft |
INR |
|
18 |
Fir/c 14 logs 338 cfts Round 2nd Normal |
0.0000 |
338.0000 Cft |
INR |
|
19 |
Fir/c 11 logs 234 cfts Round 2nd Normal |
0.0000 |
234.0000 Cft |
INR |
|
20 |
Fir/c 11 logs 380 cfts Round 2nd Normal |
0.0000 |
380.0000 Cft |
INR |
|
21 |
Fir/c 19 logs 332 cfts Round 2nd Normal |
0.0000 |
332.0000 Cft |
INR |
|
22 |
Fir/c 13 logs 352 cfts Round 2nd Normal |
0.0000 |
352.0000 Cft |
INR |
|
23 |
Fir/c 16 logs 373 cfts Round 2nd Normal |
0.0000 |
373.0000 Cft |
INR |
|
24 |
Fir/c 13 logs 342 cfts Round 2nd Normal |
0.0000 |
342.0000 Cft |
INR |
|
25 |
Deo/c 60-up 1 logs 34 cfts Round 2nd Normal |
0.0000 |
34.0000 Cft |
INR |
|
26 |
Fir/c 1 logs 67 cfts 2nd Normal (Round) |
0.0000 |
67.0000 Cft |
INR |
|
27 |
Deo/c 60 UP 5 logs 93 cfts (Round) |
0.0000 |
93.0000 Cft |
INR |
|
28 |
Deo/c 60 UP 2 logs 63 cfts (Round) 2nd Normal |
0.0000 |
63.0000 Cft |
INR |
|
29 |
Deo/c 60 UP 5 logs 120 cfts (Round) 2nd Normal |
0.0000 |
120.0000 Cft |
INR |
|
30 |
Kail/c 2 logs 37 cfts (Round) 2nd Normal |
0.0000 |
37.0000 Cft |
INR |
|
31 |
kail/c 6 logs 93 cfts (Round) 2nd Normal |
0.0000 |
93.0000 Cft |
INR |
|
32 |
Deo/c 60 UP 1 logs 18 cfts (Round) 2nd Normal |
0.0000 |
18.0000 Cft |
INR |
|
33 |
Fir/c 15 logs 312 cfts (Round) 2nd Normal |
0.0000 |
312.0000 Cft |
INR |
|
34 |
Deo/c 60 UP 2 logs 36 cfts (Round) 2nd Normal |
0.0000 |
36.0000 Cft |
INR |
|
35 |
kail/c 10 logs 210 cfts (Round) 2nd Normal |
0.0000 |
210.0000 Cft |
INR |
|
36 |
Fir/c 10 logs 205 cfts (Round) 2nd Normal |
0.0000 |
205.0000 Cft |
INR |
|
37 |
kail/c 1 logs 56 cfts (Round) 2nd Normal |
0.0000 |
56.0000 Cft |
INR |
|
38 |
Fir/c 1 logs 44 cfts (Round) 2nd Normal |
0.0000 |
44.0000 Cft |
INR |
|
39 |
Fir/c 13 logs 306 cfts (Round) 2nd Normal |
0.0000 |
306.0000 Cft |
INR |
|
40 |
kail/c 1 logs 32 cfts (Round) 2nd Normal |
0.0000 |
32.0000 Cft |
INR |
|
41 |
kail/c 9 logs 217 cfts (Round) 2nd Normal |
0.0000 |
217.0000 Cft |
INR |
|
42 |
Fir/c 13 logs 303 cfts (Round) 2nd Normal |
0.0000 |
303.0000 Cft |
INR |
|
43 |
Fir/c 11 logs 174 cfts (Round) 2nd Normal |
0.0000 |
174.0000 Cft |
INR |
|
44 |
Fir/c 12 logs 377 cfts (Round) 2nd Normal |
0.0000 |
377.0000 Cft |
INR |
|
45 |
Fir/c 19 logs 338 cfts (Round) 2nd Normal |
0.0000 |
338.0000 Cft |
INR |
|
46 |
Fir/c 15 logs 329 cfts (Round) 2nd Normal |
0.0000 |
329.0000 Cft |
INR |
|
47 |
Fir/c 1 logs 67 cfts (Round) 2nd Normal |
0.0000 |
67.0000 Cft |
INR |
|
48 |
Fir/c 6 logs 259 cfts (Round) 2nd Normal |
0.0000 |
259.0000 Cft |
INR |
|
49 |
Fir/c 5 logs 178 cfts (Round) 2nd Normal |
0.0000 |
178.0000 Cft |
INR |
|
50 |
kail/c 10 logs 268 cfts (Round) 2nd Normal |
0.0000 |
268.0000 Cft |
INR |
|
51 |
Fir/c 1 logs 76 cfts (Round) 2nd Normal |
0.0000 |
76.0000 Cft |
INR |
|
52 |
Deo/c 60-up 1 log 38 cfts (Round) Reduction |
0.0000 |
38.0000 Cft |
INR |
|
53 |
Fir/c 8 logs 251 cfts (Round) Reduction |
0.0000 |
251.0000 Cft |
INR |
|
54 |
Deo/c 60-up 2 logs 143 cfts Reduction (FCA) |
0.0000 |
143.0000 Cft |
INR |
|
55 |
Deo/c 60-up 1 logs 102 cfts Reduction (FCA) |
0.0000 |
102.0000 Cft |
INR |
|
56 |
Fir/c 5 logs 87 cfts Reduction |
0.0000 |
87.0000 Cft |
INR |
|
57 |
Fir/c 11 logs 211 cfts Reduction |
0.0000 |
211.0000 Cft |
INR |
|
58 |
Fir/c 16 logs 257 cfts Reduction |
0.0000 |
257.0000 Cft |
INR |
|
59 |
Fir/c 11 logs 223 cfts Reduction |
0.0000 |
223.0000 Cft |
INR |
|
60 |
Kail/c 1 logs 47 cfts Reduction |
0.0000 |
47.0000 Cft |
INR |
|
61 |
Kail/c 1 logs 43 cfts Reduction |
0.0000 |
43.0000 Cft |
INR |
|
62 |
Kail/c 4 logs 128 cfts Reduction |
0.0000 |
128.0000 Cft |
INR |
|
63 |
Fir/c 12 logs 272 cfts Reduction |
0.0000 |
272.0000 Cft |
INR |
|
64 |
Fir/c 12 logs 290 cfts Reduction |
0.0000 |
290.0000 Cft |
INR |
|
65 |
Kail/c 6 logs 223 cfts Reduction |
0.0000 |
223.0000 Cft |
INR |
|
66 |
Fir/c 09 logs 265 cfts Reduction |
0.0000 |
265.0000 Cft |
INR |
|
67 |
Fir/c 9 logs 280 cfts Reduction |
0.0000 |
280.0000 Cft |
INR |
|
68 |
Kail/c 1 logs 50 cfts Reduction |
0.0000 |
50.0000 Cft |
INR |
|
69 |
Kail/c 5 logs 183 cfts Reduction |
0.0000 |
183.0000 Cft |
INR |
|
70 |
Fir/c 7 logs 202 cfts Reduction |
0.0000 |
202.0000 Cft |
INR |
|
71 |
Fir/c 12 logs 400 cfts Reduction |
0.0000 |
400.0000 Cft |
INR |
|
72 |
Fir/c 13 logs 242 cfts Reduction |
0.0000 |
242.0000 Cft |
INR |
|
73 |
Fir/c 17 logs 331 cfts Reduction |
0.0000 |
331.0000 Cft |
INR |
|
74 |
Fir/c 6 logs 239 cfts Reduction |
0.0000 |
239.0000 Cft |
INR |
|
75 |
Fir/c 24 logs 475 cfts Reduction |
0.0000 |
475.0000 Cft |
INR |
|
76 |
Fir/c 6 logs 204 cfts Reduction |
0.0000 |
204.0000 Cft |
INR |
|
77 |
Fir/c 12 logs 343 cfts Reduction |
0.0000 |
343.0000 Cft |
INR |
|
78 |
Fir/c 8 logs 114 cfts Reduction |
0.0000 |
114.0000 Cft |
INR |
|
79 |
Fir/c 11 logs 415 cfts Reduction |
0.0000 |
415.0000 Cft |
INR |
|
80 |
Fir/c 10 logs 232 cfts Reduction |
0.0000 |
232.0000 Cft |
INR |
|
81 |
Fir/c 16 logs 340 cfts Reduction |
0.0000 |
340.0000 Cft |
INR |
|
82 |
Kail/c 21 logs 284 cfts Reduction |
0.0000 |
284.0000 Cft |
INR |
|
83 |
Fir/c 13 logs 264 cfts Reduction |
0.0000 |
264.0000 Cft |
INR |
|
84 |
Fir/c 12 logs 350 cfts Reduction |
0.0000 |
350.0000 Cft |
INR |
|
85 |
Fir/c 10 logs 137 cfts Reduction |
0.0000 |
137.0000 Cft |
INR |
|
86 |
Fir/c 10 logs 190 cfts Reduction |
0.0000 |
190.0000 Cft |
INR |
|
87 |
Fir/c 10 logs 248 cfts Reduction |
0.0000 |
248.0000 Cft |
INR |
|
88 |
Fir/c 8 logs 255 cfts Reduction |
0.0000 |
255.0000 Cft |
INR |
|
89 |
Fir/c 10 logs 296 cfts Reduction |
0.0000 |
296.0000 Cft |
INR |
|
90 |
Fir/c 2 logs 126 cfts Reduction |
0.0000 |
126.0000 Cft |
INR |
|
91 |
Fir/c 14 logs 417 cfts Reduction |
0.0000 |
417.0000 Cft |
INR |
|
92 |
Kail/c 5 logs 109 cfts Reduction |
0.0000 |
109.0000 Cft |
INR |
|
93 |
Fir/c 11 logs 273 cfts Reduction |
0.0000 |
273.0000 Cft |
INR |
|
94 |
Deo/c 60-up 5 logs 114 cfts Reduction |
0.0000 |
114.0000 Cft |
INR |
|
95 |
Kail/c 6 logs 100 cfts Reduction |
0.0000 |
100.0000 Cft |
INR |
|
96 |
Deo/c 60-up 3 logs 118 cfts Reduction |
0.0000 |
118.0000 Cft |
INR |
|
97 |
Deo/c 60-up 1 logs 52 cfts Reduction |
0.0000 |
52.0000 Cft |
INR |
|
98 |
Deo/c 60-up 2 logs 152 cfts Reduction |
0.0000 |
152.0000 Cft |
INR |
|
99 |
Deo/c 60-up 2 logs 69 cfts Reduction |
0.0000 |
69.0000 Cft |
INR |
|
100 |
Kail/c 16 logs 213 cfts Reduction |
0.0000 |
213.0000 Cft |
INR |
|
101 |
Deo/c 60-up 1 logs 74 cfts Reduction |
0.0000 |
74.0000 Cft |
INR |
|
102 |
Kail/c 14 logs 246 cfts Reduction |
0.0000 |
246.0000 Cft |
INR |
|
103 |
Deo/c 60 Below 21 logs 216 cfts Reduction |
0.0000 |
216.0000 Cft |
INR |
|
104 |
Deo/c 60 Below 14 logs 148 cfts Reduction |
0.0000 |
148.0000 Cft |
INR |
|
105 |
Kail/c 13 logs 221 cfts Reduction |
0.0000 |
221.0000 Cft |
INR |
|
106 |
Deo/c 60-up 2 logs 72 cfts Reduction |
0.0000 |
72.0000 Cft |
INR |
|
107 |
Kail/c 14 logs 194 cfts Reduction |
0.0000 |
194.0000 Cft |
INR |
|
108 |
Deo/c 60-up 5 logs 144 cfts Reduction |
0.0000 |
144.0000 Cft |
INR |
|
109 |
Deo/c 60 Below 16 logs 198 cfts Reduction |
0.0000 |
198.0000 Cft |
INR |
|
110 |
Deo/c 60-up 4 logs 133 cfts Reduction |
0.0000 |
133.0000 Cft |
INR |
|
111 |
Kail/c 11 logs 210 cfts Reduction |
0.0000 |
210.0000 Cft |
INR |
|
112 |
Deo/c 60-up 6 logs 125 cfts Reduction |
0.0000 |
125.0000 Cft |
INR |
|
113 |
Kail/c 7 logs 135 cfts Reduction |
0.0000 |
135.0000 Cft |
INR |
|
114 |
Deo/c 60-up 1 logs 62 cfts Reduction |
0.0000 |
62.0000 Cft |
INR |
|
115 |
Deo/c 60-up 1 logs 18 cfts Reduction |
0.0000 |
18.0000 Cft |
INR |
|
116 |
Fir/c 8 logs 138 cfts Reduction |
0.0000 |
138.0000 Cft |
INR |
|
117 |
Kail/c 4 logs 40 cfts Reduction |
0.0000 |
40.0000 Cft |
INR |
|
118 |
Deo/c 60-up 1 logs 44 cfts Reduction |
0.0000 |
44.0000 Cft |
INR |
|
119 |
Deo/c 60-up 1 logs 69 cfts Reduction |
0.0000 |
69.0000 Cft |
INR |
|
120 |
Deo/c 60-up 1 logs 18 cfts Reduction |
0.0000 |
18.0000 Cft |
INR |
|
121 |
Deo/c 60-up 1 logs 64 cfts Reduction |
0.0000 |
64.0000 Cft |
INR |
|
122 |
Fir/c 1 logs 27 cfts Reduction |
0.0000 |
27.0000 Cft |
INR |
|
123 |
Fir/c 6 logs 202 cfts Reduction |
0.0000 |
202.0000 Cft |
INR |
|
124 |
Kail/c 6 logs 211 cfts Reduction |
0.0000 |
211.0000 Cft |
INR |
|
125 |
Kail/c 1 logs 19 cfts Reduction |
0.0000 |
19.0000 Cft |
INR |
|
126 |
Kail/c 5 logs 170 cfts Reduction |
0.0000 |
170.0000 Cft |
INR |
|
127 |
Deo/c 60 Below 7 logs 75 cfts Reduction |
0.0000 |
75.0000 Cft |
INR |
|
128 |
Kail/c 14 logs 298 cfts Reduction |
0.0000 |
298.0000 Cft |
INR |
|
129 |
Kail/c 12 logs 225 cfts Reduction |
0.0000 |
225.0000 Cft |
INR |
|
130 |
Kail/c 13 logs 279 cfts Reduction |
0.0000 |
279.0000 Cft |
INR |
|
131 |
Kail/c 14 logs 188 cfts Reduction |
0.0000 |
188.0000 Cft |
INR |
|
132 |
Kail/c 7 logs 155 cfts Reduction |
0.0000 |
155.0000 Cft |
INR |
|
133 |
Kail/c 14 logs 260 cfts Reduction |
0.0000 |
260.0000 Cft |
INR |
|
134 |
Kail/c 13 logs 290 cfts Reduction |
0.0000 |
290.0000 Cft |
INR |
|
135 |
Kail/c 10 logs 208 cfts Reduction |
0.0000 |
208.0000 Cft |
INR |
|
136 |
Deo/c 60 Below 16 logs 158 cfts Reduction |
0.0000 |
158.0000 Cft |
INR |
|
137 |
Kail/c 3 logs 61 cfts Reduction |
0.0000 |
61.0000 Cft |
INR |
|
138 |
Fir/c 15 logs 218 cfts Reduction |
0.0000 |
218.0000 Cft |
INR |
|
139 |
Fir/c 6 logs 137 cfts Reduction |
0.0000 |
137.0000 Cft |
INR |
|
140 |
Fir/c 6 logs 129 cfts Reduction |
0.0000 |
129.0000 Cft |
INR |
|
141 |
Fir/c 5 logs 131 cfts Reduction |
0.0000 |
131.0000 Cft |
INR |
|
142 |
Fir/c 8 logs 206 cfts Reduction |
0.0000 |
206.0000 Cft |
INR |
|
143 |
Kail/c 3 logs 47 cfts Reduction |
0.0000 |
47.0000 Cft |
INR |
|
144 |
Fir/c 10 logs 272 cfts Reduction |
0.0000 |
272.0000 Cft |
INR |
|
145 |
Kail/c 10 logs 287 cfts Reduction |
0.0000 |
287.0000 Cft |
INR |
|
146 |
Fir/c 2 logs 85 cfts Reduction |
0.0000 |
85.0000 Cft |
INR |
|
147 |
Fir/c 12 logs 251 cfts Reduction |
0.0000 |
251.0000 Cft |
INR |
|
148 |
Fir/c 7 logs 202 cfts Reduction |
0.0000 |
202.0000 Cft |
INR |
|
149 |
Fir/c 15 logs 283 cfts Reduction |
0.0000 |
283.0000 Cft |
INR |
|
150 |
Fir/c 21 logs 292 cfts Reduction |
0.0000 |
292.0000 Cft |
INR |
|
151 |
Fir/c 8 logs 166 cfts Reduction |
0.0000 |
166.0000 Cft |
INR |
|
152 |
Fir/c 9 logs 165 cfts Reduction |
0.0000 |
165.0000 Cft |
INR |
|
153 |
Fir/c 11 logs 320 cfts Reduction |
0.0000 |
320.0000 Cft |
INR |
|
154 |
Kail/c 8 logs 212 cfts Reduction |
0.0000 |
212.0000 Cft |
INR |
|
155 |
Fir/c 10 logs 274 cfts Reduction |
0.0000 |
274.0000 Cft |
INR |
|
156 |
Kail/c 12 logs 261 cfts Reduction |
0.0000 |
261.0000 Cft |
INR |
|
157 |
Fir/c 14 logs 365 cfts Reduction |
0.0000 |
365.0000 Cft |
INR |
|
158 |
Fir/c 12 logs 275 cfts Reduction |
0.0000 |
275.0000 Cft |
INR |
|
159 |
Fir/c 13 logs 332 cfts Reduction |
0.0000 |
332.0000 Cft |
INR |
|
160 |
Deo/c 60 Below 3 logs 23 cfts Reduction |
0.0000 |
23.0000 Cft |
INR |
|
161 |
Kail/c 10 logs 156 cfts Reduction |
0.0000 |
156.0000 Cft |
INR |
|
162 |
Fir/c 8 logs 146 cfts Reduction |
0.0000 |
146.0000 Cft |
INR |
|
163 |
Deo/c 60-up 3 logs 76 cfts Reduction |
0.0000 |
76.0000 Cft |
INR |
|
164 |
Fir/c 12 logs 143 cfts Reduction |
0.0000 |
143.0000 Cft |
INR |
|
165 |
Fir/c 9 logs 207 cfts Reduction |
0.0000 |
207.0000 Cft |
INR |
|
166 |
Fir/c 9 logs 328 cfts Reduction |
0.0000 |
328.0000 Cft |
INR |
|
167 |
Fir/c 2 logs 195 cfts Reduction |
0.0000 |
195.0000 Cft |
INR |
|
168 |
Fir/c 10 logs 352 cfts Reduction |
0.0000 |
352.0000 Cft |
INR |
|
169 |
Kail/c 10 logs 193 cfts Reduction |
0.0000 |
193.0000 Cft |
INR |
|
170 |
Fir/c 15 logs 331 cfts Reduction |
0.0000 |
331.0000 Cft |
INR |
|
171 |
Fir/c 15 logs 354 cfts Reduction |
0.0000 |
354.0000 Cft |
INR |
|
172 |
Kail/c 5 logs 96 cfts Reduction |
0.0000 |
96.0000 Cft |
INR |
|
173 |
Fir/c 8 logs 237 cfts Reduction |
0.0000 |
237.0000 Cft |
INR |
|
174 |
Fir/c 15 logs 378 cfts Reduction |
0.0000 |
378.0000 Cft |
INR |
|
175 |
Fir/c 13 logs 367 cfts Reduction |
0.0000 |
367.0000 Cft |
INR |
|
176 |
Deo/c 60-up 6 logs 134 cfts Reduction |
0.0000 |
134.0000 Cft |
INR |
|
177 |
Deo/c 60-up 4 logs 89 cfts Reduction |
0.0000 |
89.0000 Cft |
INR |
|
178 |
Deo/c 60-up 5 logs 119 cfts Reduction |
0.0000 |
119.0000 Cft |
INR |
|
179 |
Fir/c 8 logs 203 cfts Reduction |
0.0000 |
203.0000 Cft |
INR |
|
180 |
Deo/c 60-up 8 logs 179 cfts Reduction |
0.0000 |
179.0000 Cft |
INR |
|
181 |
Kail/c 13 logs 206 cfts Reduction |
0.0000 |
206.0000 Cft |
INR |
|
182 |
Kail/c 12 logs 161 cfts Reduction |
0.0000 |
161.0000 Cft |
INR |
|
183 |
Fir/c 3 logs 65 cfts Reduction |
0.0000 |
65.0000 Cft |
INR |
|
184 |
Fir/c 19 logs 379 cfts Reduction |
0.0000 |
379.0000 Cft |
INR |
|
185 |
Fir/c 9 logs 360 cfts Reduction |
0.0000 |
360.0000 Cft |
INR |
|
186 |
Deo/c 60-up 1 logs 106 cfts Reduction |
0.0000 |
106.0000 Cft |
INR |
|
187 |
Kail/c 2 logs 46 cfts Reduction |
0.0000 |
46.0000 Cft |
INR |
|
188 |
Fir/c 23 logs 276 cfts Reduction |
0.0000 |
276.0000 Cft |
INR |
|
189 |
Fir/c 7 logs 164 cfts Reduction |
0.0000 |
164.0000 Cft |
INR |
|
190 |
Fir/c 2 logs 183 cfts Reduction |
0.0000 |
183.0000 Cft |
INR |
|
191 |
Fir/c 4 logs 154 cfts Reduction |
0.0000 |
154.0000 Cft |
INR |
|
192 |
Kail/c 11 logs 190 cfts Reduction |
0.0000 |
190.0000 Cft |
INR |
|
193 |
Kail/c 12 logs 185 cfts Reduction |
0.0000 |
185.0000 Cft |
INR |
|
194 |
Deo/c 60-up 2 logs 61 cfts Reduction |
0.0000 |
61.0000 Cft |
INR |
|
195 |
Kail/c 10 logs 151 cfts Reduction |
0.0000 |
151.0000 Cft |
INR |
|
196 |
Kail/c 13 logs 213 cfts Reduction |
0.0000 |
213.0000 Cft |
INR |
|
197 |
Kail/c 14 logs 155 cfts Reduction |
0.0000 |
155.0000 Cft |
INR |
|
198 |
Kail/c 13 logs 182 cfts Reduction |
0.0000 |
182.0000 Cft |
INR |
|
199 |
Kail/c 15 logs 170 cfts Reduction |
0.0000 |
170.0000 Cft |
INR |
|
200 |
Kail/c 5 logs 137 cfts Reduction |
0.0000 |
137.0000 Cft |
INR |
|
201 |
Kail/c 3 logs 69 cfts Reduction |
0.0000 |
69.0000 Cft |
INR |
|
202 |
Kail/c 23 logs 258 cfts Reduction |
0.0000 |
258.0000 Cft |
INR |
|
203 |
Kail/c 15 logs 195 cfts Reduction |
0.0000 |
195.0000 Cft |
INR |
|
204 |
Kail/c 13 logs 336 cfts Reduction |
0.0000 |
336.0000 Cft |
INR |
|
205 |
Kail/c 18 logs 281 cfts Reduction |
0.0000 |
281.0000 Cft |
INR |
|
206 |
Deo/c 60-up 1 logs 44 cfts Reduction |
0.0000 |
44.0000 Cft |
INR |
|
207 |
Deo/c 60-up 1 logs 41 cfts Reduction |
0.0000 |
41.0000 Cft |
INR |
|
208 |
Deo/c 60-up 1 logs 39 cfts Reduction |
0.0000 |
39.0000 Cft |
INR |
|
209 |
Deo/c 60-up 1 logs 42 cfts Reduction |
0.0000 |
42.0000 Cft |
INR |
|
210 |
Deo/c 60-up 3 logs 86 cfts Reduction |
0.0000 |
86.0000 Cft |
INR |
|
211 |
Fir/c 2 logs 52 cfts Reduction (FCA) |
0.0000 |
52.0000 Cft |
INR |
|
212 |
Kail/c 1 logs 41 cfts Reduction (FCA) |
0.0000 |
41.0000 Cft |
INR |
|